Aggregator
Gavin Newsom hails Trump Accounts as ‘best’ thing the prez has ever done in rare lovefest
Rangers ink Vincent Iorio to one-year deal after midseason audition
California’s Home of Chicken and Waffles suddenly shuts down after 20-year run
Mobility Data Flashes Warning Sign Along Pakistan's Iran-Linked Copper-Corridor
AI-powered geospatial data platform xMap's data scientist, Dana Harrison, asked in a LinkedIn post: "Can Mobility Data Spot Commodity Supply Risk Before the Market Does?"
Harrison used location data from points of interest and human mobility data to focus on what she says are "changes in human movement" over recent months along Pakistan's Chagai copper-gold corridor, home to Saindak and the massive Reko Diq development, which is located near the Iranian border.
Harrison continued:
On this episode of The Reckless Rabithole, I noodled around with xMap mobility data along Pakistan's Chagai copper-gold corridor, home to Saindak and the massive Reko Diq development.
During a period of growing security and logistics disruptions, mobility in Nushki and Dalbandin began to diverge materially from comparable locations elsewhere in Balochistan, with both ending July roughly 20 index points below the regional benchmark.
Not suggesting mobility caused or predicted the disruption. But it raises a question I find much more interesting:
Could changes in human movement provide an early signal of operational stress around critical-mineral supply chains?
The data does not directly track copper shipments and/or mine production. It merely shows overall human movement is declining, and sharp declines may suggest road restrictions, security operations, reduced commercial activity, telecommunications outages, or population displacement along the N-40 Highway, the main artery connecting Quetta with Nushki, Dalbandin, Saindak, and Pakistan's border with Iran.
Source: x-Map's Dana HarrisonFor context, the Chagai copper-gold corridor lies largely along the N-40 Highway near both Iran and Afghanistan and contains two strategically important mining assets:
Given President Trump's "ECONOMIC D-DAY" statement against Iran earlier this week, in which he warned that any country working with Iran would suffer "severe economic consequences," it remains an open-ended question why mobility is declining in Pakistan's critical-mineral corridor (near Iran). However, this type of data may hint at potential future supply disruptions emerging from the region.
Giants already seeing payoff from demanding John Harbaugh training camp
Accused casino slasher flashes evil glare wearing suicide vest in first court appearance
TikTok to pay $400m to US in one of largest child privacy settlements
Trump backs ‘honest’ SC Sen. Darline Graham after national security debate flop: ‘She’s very smart’
American colleges are facing an enrollment crisis as young people turn to trades
Supreme Court Chief Justice Pauses Block On White House Ballroom Construction
Authored by Zachary Stieber via The Epoch Times,
Supreme Court Chief Justice John Roberts on Aug. 21 said the Trump administration can proceed with construction of a new White House ballroom.
Roberts, in a brief order, paused the preliminary injunction that had been entered by a U.S. district judge and upheld by a federal appeals court.
The lower court order “is hereby stayed pending further order of The Chief Justice or of the Court,” Roberts said, granting an appeal from the Trump administration.
Construction of the planned 90,000-square-foot ballroom began in 2025. Its cost has been pegged at $400 million, with financing coming from private donors.
Judge Richard Leon of the U.S. District Court for the District of Columbia in March entered the preliminary injunction against construction of the ballroom.
Leon said that there are no laws that give the president the authority to build the ballroom and that construction must stop until Congress authorized the ballroom’s completion, even if private funds are being used for the work. Leon later clarified that the block was for above-ground construction.
A panel of judges on the U.S. Court of Appeals for the District of Columbia Circuit in April temporarily halted Leon’s injunction as it considered the case.
A majority of the panel on Aug. 7 reinstated the injunction. The majority said that “whether or not a massive ballroom should be constructed is for Congress to decide and is not a matter for Executive self-help” and that Congress had not ceded “unfettered authority” to the president to dramatically alter the White House.
That prompted the government’s appeal to the Supreme Court.
U.S. Solicitor General D. John Sauer said in the emergency application to the court that a quick decision was imperative because the injunction would halt work that was “vitally required by national security.”
Officials have also said that a completed ballroom would host crucial diplomatic functions and that construction delays give foreign countries more time to gather intelligence on the White House complex.
The National Trust for Historic Preservation, which filed the case, told Roberts that a removal of the injunction would cause irreparable harm because the ballroom will be substantially finished soon absent an injunction, and be virtually impossible to deconstruct once completed, citing administration statements.
“The injuries to the National Trust, its members, and the public from the unauthorized construction of the ballroom—catalogued by Petitioners’ own Environmental Assessment and already found to be irreparable by the lower courts—will in all likelihood become irreversible,” it said in a filing.
Tyler Durden Fri, 08/21/2026 - 18:25